Envor Protech Advanced Digestion process

EPAD technology is based on continuous, industrial scale, anaerobic digestion process. EPAD process has been developed by the owners of Envor Protech Oy in course of  20 years. The process is the first, stable, large scale continuous process in Finland that is still working - the first reference being the biogas plant in city of Forssa 1999.

Due to efficient process and equipment design the capacity of EPAD is higher than that of other available processes. Based on customer’s needs and feedstock the process can be tailored to be either mesophilic (low temperature) or thermophilic (high temperature)

Each plant we deliver is tailored to match the needs of our customers. The process is designed to insure maximum bioenergy recovery and resources recycling. We aim to design closed loop systems where material and energy flows are optimized to produce environmentally sustainable, highly efficient process. Energy produced in the process can be utilized as heat, electricity or fuel.

The scope of our services includes for example feasibility studies, process design packages, key equipment deliveries, turn-key solutions as well as Build, Own and Operate – solutions.

Kitee office

Envor Protech Oy
Niittytie 7B
FI-82500 Kitee
Finland
Tel. +358 400 789 831

Jyväskylä office

Envor Protech Oy
Yliopistonkatu 21 A 13
FI-40100 Jyväskylä
Finland
Tel. +358 40 519 4383

Forssa office

Envor Protech Oy
Voimalankatu 56
FI-30420 Forssa
Finland
Tel. +358 40 451 0901

Hyvinkää Office

Envor Protech Oy
Kerkkolankatu 30
FI-05800 Hyvinkää
Finland
Tel. +358 50 431 7599

©2017 Envor Protech Oy - Z-Media